Plan what the evidence must establish

# Software verification plan: template and *example*

A software verification plan defines how a team will establish that software meets specified requirements. It records the scope, methods, responsibilities, environments, acceptance criteria, schedule and evidence to retain. It also explains how failures and changes are handled, so every planned obligation has an owner and a reviewable path to completion.[\[7\]](https://reqproof.com/topics/software-verification-plan#s7)

[Leonid Bugaev](https://reqproof.com/about) Founder of Proof · creator of GoReplay and jsonparser

Updated 27 October 202633 min read · example and sources checked

[↓ Download the verification plan kit](https://reqproof.com/assets/software-verification-plan/downloads/software-verification-plan-kit.zip) Editable Word template, Markdown plan, filled example, CSV register and runnable evidence. No email required.

## What you’ll leave with

**[Write a usable plan.](https://reqproof.com/topics/software-verification-plan#template)** Start with the editable template and name the checks, people and decisions your project needs.

**[Inspect the missing check.](https://reqproof.com/topics/software-verification-plan#example)** See four passing tests miss a partial import, then follow the added case and its repair.

**[Keep the plan connected.](https://reqproof.com/topics/software-verification-plan#proof-workflow)** Inspect how Proof connects project intent and evidence, and how MCP gives coding agents that context.

- **12 plan sections**in the editable planning template
- **6 verification obligations**in the worked import plan
- **5 executable cases**against real SQLite state
- **3 recorded stages**baseline, exposed failure and fix
- **Checked 27 Oct 2026**sources, artifacts and example

These are counts for this guide’s [template](https://reqproof.com/topics/software-verification-plan#template) and [bounded teaching example](https://reqproof.com/topics/software-verification-plan#example), not a prescribed size for every plan.

Free planning kit / by Proof

## Give every promise a way to be *checked.*

Take an editable plan and a filled example into your project. Keep the expected result, owner and evidence beside the requirement.

[Get the Word template](https://reqproof.com/assets/software-verification-plan/downloads/software-verification-plan-template.docx)Original engineering template · adaptable to your project

Working through one written rule? [Try Proof’s free Spec Lab →](https://reqproof.com/spec-lab)

ONE PLANNED CASE · T05 within VP03

### Reject the batch. Keep stored data unchanged.

**Method**
Test · selected case: malformed row after a valid row

**Expected**
INVALID\_ROW error · zero stored rows and zero completion checkpoints from that batch

**Evidence**
Observed database state + run record

**Owner**
Developer

Planned Execution and review come next. VP03 requires both T03 (malformed first row) and T05 (malformed later row).

[↓ Verification register CSV · ready to adapt](https://reqproof.com/assets/software-verification-plan/downloads/verification-register.csv)

Name the promise.
Plan the evidence.
Keep the decision.

01 / The agreement before the run

## What is a software verification plan?

A verification plan makes the evidence obligations explicit before someone decides the software is ready. It identifies the work products and requirements in scope, chooses ways to examine them, and defines the observations that would support a conclusion. The work can include requirements and design reviews, code analysis, interface checks, executable tests and other methods suited to the risk.[\[4\]](https://reqproof.com/topics/software-verification-plan#s4)[\[10\]](https://reqproof.com/topics/software-verification-plan#s10)

For software, “we will test the import” is too vague to guide another engineer. A useful entry says which import behavior matters, what data and environment exercise it, what must happen to stored state, who runs the check, and where its result will be recorded. An unresolved expected result belongs in a decision queue with an owner.

The plan can be a short controlled document, a versioned set of repository records, or part of a larger development plan. Its usefulness comes from the decisions it preserves. The structure should make it possible to assess a proposed change, prepare a credible run and explain what remains incomplete.

A software verification plan is broader than a list of test cases. A test plan organizes testing; a verification report records performed work and results. A combined V&V plan also addresses whether the product suits its intended use. Organizations may combine these records, provided the responsibilities and evidence stay clear.[\[3\]](https://reqproof.com/topics/software-verification-plan#s3)[\[4\]](https://reqproof.com/topics/software-verification-plan#s4)

Here, “verification plan” means software planning. Hardware plans often use the same name but involve different design artifacts, testbenches and coverage models.

## Verification plan, test plan, strategy or report?

Use the question the document must answer to decide what belongs in it. These are practical distinctions; they do not require six separate files.

The planning records and the decisions they support

| Record | Main question | What it contains |
| --- | --- | --- |
| Software verification plan | How will we establish conformance to the specified requirements? | Scope, methods, criteria, people, environments, evidence and controls. |
| Software test plan | How will the testing effort be organized? | Test levels, types, data, environments, resources, schedule and reporting. Tests may support verification or validation.[\[3\]](https://reqproof.com/topics/software-verification-plan#s3) |
| Verification strategy | Why use these methods and priorities? | Risk rationale, levels of checking, trade-offs and where greater rigor is needed. |
| Software V&V plan | Will it meet both specified requirements and intended user needs? | Coordinated verification and validation activities with distinct claims and criteria. |
| Development plan | How will we create, integrate and maintain the software? | Lifecycle, organization, deliverables, dependencies and schedule, including or linking the verification work. |
| Verification report | What ran, against which baseline, and what did it establish? | Observed results, evidence references, discrepancies, limits and proposed disposition. |

A traceability matrix connects the records. A row linking a requirement to a test proves that a link exists; the assertion, execution, freshness and acceptance still need examination. See the companion [requirements traceability matrix guide](https://reqproof.com/topics/requirements-traceability-matrix).

02 / Start with the artifact

## Free software verification plan template

The kit is an original, editable starting point for a component, release or consequential change. Use the Word document for a review process, Markdown for a repository, and the CSV register for repeated obligations. Keep the plan small enough to maintain and detailed enough that someone else can perform the work.

[EDITABLE DOCUMENT **Word template ↓**Scope, methods, roles, criteria and change control.](https://reqproof.com/assets/software-verification-plan/downloads/software-verification-plan-template.docx)[REPOSITORY FORMAT **Markdown template ↓**Review the plan alongside the code and requirements.](https://reqproof.com/assets/software-verification-plan/downloads/software-verification-plan-template.md)[REPEATED OBLIGATIONS**CSV register ↓**One row per evidence obligation, with space for results.](https://reqproof.com/assets/software-verification-plan/downloads/verification-register.csv)

### What should a verification plan include?

Twelve sections to tailor to your project

| Section | The decision to record |
| --- | --- |
| 1. Identity and authority | Plan ID, revision, owner, review status and who may approve it. |
| 2. Scope and baseline | Software, interfaces, requirements and configurations covered; exclusions and the plans that own them. |
| 3. Applicable basis and risks | Binding requirements and standards, informative sources, failure consequences and unresolved assumptions. |
| 4. Verification strategy | Methods, levels, priorities and the reason each is suited to its claim. |
| 5. Verification register | Requirement, method, expected observation, owner, environment and planned evidence for every obligation. |
| 6. Validation activities | Intended users and use, operating context, representative scenarios and who assesses suitability. |
| 7. Environments and resources | Builds, tools, versions, test data, infrastructure, access and relevant target differences. |
| 8. Roles and independence | Who prepares, executes, reviews and accepts; required separation of responsibilities. |
| 9. Schedule and milestones | Development dependencies, readiness gates, review points and time reserved for corrections. |
| 10. Results and anomalies | How failed, missing, blocked, partial or excepted obligations are recorded and resolved. |
| 11. Evidence and traceability | Artifact locations, identities, retention and the links from claims to observed results. |
| 12. Changes and completion | Impact review, rerun triggers, reporting, residual issues and the acceptance decision. |

Verify the complete kit with its [SHA-256 checksum](https://reqproof.com/assets/software-verification-plan/downloads/software-verification-plan-kit.zip.sha256). When importing CSV files into a spreadsheet, preserve the requirement and evidence identifiers as text. The stage export retains all obligations, including open work.

These sections are a practical structure, not a mandatory document count or a certification template. NASA’s development-planning guidance provides a useful precedent for placing verification and validation activities inside a coordinated lifecycle plan.[\[2\]](https://reqproof.com/topics/software-verification-plan#s2) Tailor the template to the sources and controls that actually govern your project.

For a small change, reference the existing environment, roles and policies rather than copying their full text. Record what differs. For a new platform or safety-related component, the scope and governing obligations may require substantially more detail.

03 / An example you can reproduce

## Software verification plan example: an import that leaves partial data

Our worked plan covers a small batch importer backed by SQLite. An accepted batch should commit its rows and completion record together. Repeating a completed import ID should not duplicate data. A malformed or empty batch should be rejected with the specified stored state. The example chooses whole-batch rejection explicitly; a product that permits partial imports needs different requirements and tests.

The first implementation commits each row as it goes. Its four initial tests pass: a valid import, a completed replay, a malformed first row and an empty batch. But the plan’s malformed-input obligation also requires a bad row *after* a valid one. That missing case asks whether rejection leaves partial data behind.

**4/4**initial tests passrecorded execution

**3/6**verification obligations supportedone partial, two missing

**+1**case exposes the defectinspect persisted state

Adding that case produces a real failure: the batch is rejected, yet the earlier valid row remains committed. Wrapping the operation in a transaction repairs the observed defect. All five selected cases then pass. Two other planned verification obligations still have no evidence: concurrent retries and review of the error/recovery documentation. A separate operator-validation activity is also unperformed.

Recorded teaching runs / inspect the evidence

### A green run can leave an open plan.

Compare three recorded local executions. The kit’s teaching manifest checker applies each obligation’s declared evidence rule to the recorded teaching evidence; “Supported” means that rule is met. This explorer displays retained records, not native Proof results or live execution; release acceptance remains a separate decision. VP identifiers name verification obligations, IMP identifiers name import requirements, and T identifiers name selected test cases.

The initial four cases pass. VP03 remains partial because T05 was required by the plan but did not run. Concurrent retries, the documentation review and operator validation are also unperformed.

**4/4**executed cases passed

**3/6**verification obligations supported

**Incomplete**3 verification obligations need work; validation is unperformed.

1. Four passing tests — all six verification obligations

| Obligation | Evidence status | Required evidence | Recorded or missing |
| --- | --- | --- | --- |
| Persist a valid batch and completion checkpoint (VP01 · IMP01) | Supported | T01 | Recorded: T01. |
| Replay a completed import with the same payload (VP02 · IMP02) | Supported | T02 | Recorded: T02. |
| Reject malformed batches without stored rows or checkpoints (VP03 · IMP03) | Partial | T03 + T05 | Recorded: T03. Missing: T05. |
| Reject an empty batch without stored rows or checkpoints (VP04 · IMP04) | Supported | T04 | Recorded: T04. |
| Check concurrent retries for duplicates and agreed responses (VP05 · IMP05) | Not run | INT-CONCURRENT-01 | Missing: INT-CONCURRENT-01. |
| Review error and recovery instructions (VP06 · IMP06) | Not performed | REVIEW-RECOVERY-01 | Missing: REVIEW-RECOVERY-01. |

**VAL01 · operator recovery validation · not performed** Separate from the six verification obligations. No operator exercise or acceptance decision is claimed in any of these runs.

Inspect test cases and the stored-state observation

Selected case outcomes for this stage

| Case | What it checks | Result |
| --- | --- | --- |
| T01 | Valid three-row batch and completion checkpoint | Passed |
| T02 | Replay a completed import ID with the same payload | Passed |
| T03 | Malformed first row leaves no persisted import state | Passed |
| T04 | Empty batch is rejected without persisted import state | Passed |
| T05 | Malformed later row rejects the whole batch | Not run |

#### Malformed later row rejects the whole batch

Not run in this stage

#### Expected response and persisted state

```
[
  {
    "outcome": {
      "error_code": "INVALID_ROW",
      "kind": "rejected",
      "message": "row 2: value must be an integer"
    },
    "persisted_state": {
      "checkpoints": [],
      "rows": []
    }
  }
]
```

#### Observed response and persisted state

```
No observation was recorded. The expected result is a planned oracle, not an execution result.
```

Export this complete recorded stage, including open work.

Recorded 2026-10-27 · Python 3.12.14 · SQLite 3.53.1 · buggy / legacy. Plan SHA-256 d6002573f16e…

Choose a stage to inspect its recorded evidence.

All three recorded outcomes — the plan remains incomplete

| Stage | Tests passed | Verification supported | VP03 |
| --- | --- | --- | --- |
| 1. Four passing tests | 4/4 | 3/6 | Partial |
| 2. Add the missing case | 4/5 | 3/6 | Failed |
| 3. Repair the transaction | 5/5 | 4/6 | Supported |

### Read the verification matrix as a set of obligations

The matrix keeps requirements and expected observations separate from results. VP03 needs both malformed-input cases; one passing case only partly supports it. VP05 and VP06 retain their own methods and owners, so a successful test command cannot silently erase them.

The planned verification register — requirements, methods and oracles

| ID / requirement | Method / evidence | Acceptance criterion | Owner role |
| --- | --- | --- | --- |
| VP01<br>IMP01 | test<br>T01 | T01 returns completed with row\_count 3; exactly the three specified rows and one completed checkpoint persist. | Developer |
| VP02<br>IMP02 | test<br>T02 | T02 returns completed then replayed with row\_count 3; persisted rows and checkpoint are unchanged by replay. | Developer |
| VP03<br>IMP03 | test<br>T03 + T05 | Both T03 and T05 return the specified INVALID\_ROW error; after each rejected batch, persisted rows and checkpoints are empty. | Developer |
| VP04<br>IMP04 | test<br>T04 | T04 returns EMPTY\_BATCH and leaves persisted rows and checkpoints empty. | Developer |
| VP05<br>IMP05 | test<br>INT-CONCURRENT-01 | Run the agreed simultaneous-retry procedure against the target service; observe one row set and one checkpoint, and compare both responses with the approved concurrency contract. | Integration owner (not assigned in this teaching run) |
| VP06<br>IMP06 | review<br>REVIEW-RECOVERY-01 | Review the actual error and recovery instructions against IMP06; record reviewer, reviewed revision, findings and their disposition. | Documentation reviewer (no review performed) |

**Validation stays separate.** VAL01 asks whether an operator can understand the rejection, correct the input and retry successfully in the intended workflow. No representative operator exercise was performed for this teaching fixture. The plan records the activity without presenting a simulated approval as a completed study.

[Read the filled plan ↓](https://reqproof.com/assets/software-verification-plan/downloads/software-verification-plan-example.md)[Inspect the recorded results ↗](https://reqproof.com/assets/software-verification-plan/downloads/import-example-results.json)[Get source, commands and evidence ↓](https://reqproof.com/assets/software-verification-plan/downloads/software-verification-plan-kit.zip)

**What this example establishes**

These are local Python/SQLite executions of a bounded teaching implementation. They show how a missing planned case can expose an observable defect, and why passing the repaired cases does not complete the plan. They are original recorded runs, with source and commands in the kit.[\[15\]](https://reqproof.com/topics/software-verification-plan#s15) Concurrency, deployment integration and operator validation remain outside the executed evidence.

Watch / 2 min 50 sec

## Follow the plan through the failure.

See the same requirement move from a planned check to an observed failure and a repaired result, while the remaining obligations stay visible.

Narrated, with on-screen captions. Based on the recorded teaching runs; no product execution is implied.

Read the complete video transcript

This 170-second narrated walkthrough uses recorded local Python/SQLite teaching runs. It does not show a run of the Proof product or a customer system. Captions and additional visual information follow.

**0:00–0:18 — Four passing tests. An unfinished plan.**

This recorded teaching example uses local Python and SQLite. It is separate from Proof product execution. The initial four tests all pass. Yet only three of six verification obligations have complete supporting evidence.

**Visual information:** The initial run shows 4 of 4 selected cases passed. VP03 is partial: T03 is present, but required case T05 is missing. Across the six declared verification obligations, three are supported, one is partial, and two lack evidence. This is a recorded Python/SQLite teaching example, not a Proof product run.

**0:18–0:36 — A rejection must leave no partial data.**

VP03 requires malformed input to return an error and leave no rows or completion checkpoint from the batch. It needs two cases: a bad first row and a bad later row. The initial run omits T05.

**Visual information:** Requirement IMP03 revision 1 requires an explicit row error and no persisted rows or completion checkpoint from the rejected batch. Verification obligation VP03 uses a test method and the Developer owner role. It requires both T03, malformed first row, and T05, malformed later row. In the initial run T03 passed and T05 has no execution evidence.

**0:36–0:57 — Move the bad row after a valid row.**

T05 starts with valid row-a, value eleven. The second row has an invalid value; a third row follows. Before running it, the plan specifies INVALID\_ROW, zero persisted rows, and zero completion checkpoints. The response alone is insufficient.

**Visual information:** T05 input for batch-001: first row item\_id row-a with integer value 11; second row item\_id row-b with string value invalid; third row item\_id row-c with integer value 33. The planned oracle is rejection with INVALID\_ROW and message row 2: value must be an integer, with zero persisted rows and zero completion checkpoints. These are expected observations, not yet the result shown in the next scene.

**0:57–1:21 — The error is right. The state is wrong.**

The expanded buggy run passes four of five cases. T05 returns the expected error, but a new connection still sees row-a. Its value is eleven. The earlier per-row commit survives rejection, violating whole-batch rejection. VP03 now has failed evidence.

**Visual information:** Expected and observed T05 outcomes both report INVALID\_ROW. Expected persisted rows: zero. Observed persisted rows: one, item\_id row-a with value 11 and import\_id batch-001. Expected and observed completion checkpoints: zero. The runner closed the operation connection and read the persisted state through a new connection. Expanded buggy result: 4 of 5 selected cases passed; T05 failed; VP03 failed.

**1:21–1:42 — One transaction. Then rerun the cases.**

The repair puts row inserts and the completion checkpoint in one transaction. The malformed later row now triggers rollback. All five selected cases pass. T05 leaves zero rows and zero checkpoints, so VP03 is supported for this recorded basis.

**Visual information:** A schematic of the actual repair groups row inserts and completion-checkpoint insertion in one transaction. An exception causes rollback. The fixed implementation's expanded suite passes 5 of 5 selected local cases. T05 still returns INVALID\_ROW, and the reopened database has zero rows and zero completion checkpoints. VP03 now meets its declared evidence rule. This does not establish concurrency or production behavior.

**1:42–2:08 — Five passed cases. The plan stays open.**

The fixed run supports four of six verification obligations. VP05 concurrency testing is not run; VP06 documentation review is not performed. VAL01 is separate: an intended operator must diagnose, correct, and retry the batch. That validation activity is not performed.

**Visual information:** The fixed report supports four of the six declared verification obligations. VP05, concurrent retries against the target service, is not run; it also needs an agreed competing-response contract. VP06, the error/recovery documentation review, is not performed. Separately, validation obligation VAL01, representative operator recovery, is not performed. The declared plan remains incomplete.

**2:08–2:32 — Keep four states separate.**

Planned names the method, criterion, and owner. Executed records observations. Current means the evidence still matches its basis, or reuse is justified. Accepted requires a recorded decision by the designated authority. A passing test command does not make that decision. No acceptance is claimed here.

**Visual information:** Four distinct questions are displayed. Planned: which method, criterion, and owner? Executed: which observations and run or review record? Current: does the requirement, code, configuration and environment still match, or has reuse been justified? Accepted: what decision did the designated authority record? These are separate concepts, not automatic promotions. The teaching checker binds evidence to exact plan and captured source hashes; a production reuse decision requires impact assessment. This fixture contains no acceptance decision.

**2:32–2:50 — Make the next planned check useful.**

Free Spec Lab helps plan one written rule. Review its interpretation and proposed cases. For project scope, explore Proof's portal and MCP workflow. Keep planned checks, executed evidence, and acceptance distinct.

**Visual information:** For one written rule, try the free Spec Lab at reqproof.com/spec-lab, review the interpreted formula, and take the proposed test plan into your workflow. For wider project scope, the page links to portal.reqproof.com and reqproof.com/agents for the portal and MCP workflow. Proposed cases still need review and execution, and acceptance remains a separate decision. This closing is a product-navigation invitation, not a product execution demonstration.

Continue with [free Spec Lab for one written rule](https://reqproof.com/spec-lab), the [Proof portal](https://portal.reqproof.com/), or the [MCP workflow](https://reqproof.com/agents). The source and recorded import reports accompany this guide.

[Build the same evidence trail into your plan ↑](https://reqproof.com/topics/software-verification-plan#template)

04 / The working method

## How to write a software verification plan

Start with the decision the plan must support. A change to one import function and a new system release need different scopes. In both cases, another person should be able to follow the plan without reconstructing the author’s assumptions.

### 1. Define the scope and identify the baseline

Name the component, release or change, the requirements it must satisfy, the interfaces it touches and the configurations to be assessed. Give each referenced artifact a stable identity and revision. Describe exclusions with a reason and an accountable destination: “database failover is covered by the platform recovery plan” is more useful than silently omitting it.

In the import example, a single-process SQLite fixture is an explicit execution boundary. It cannot establish the behavior of a distributed service, a production storage engine or two concurrent callers. Those claims need their own planned evidence.

### 2. Turn requirements and risks into evidence obligations

For each behavior, ask what could go wrong and what observation would distinguish the intended behavior from a plausible mistake. Include rejection paths, data changes, boundaries, recovery, dependencies and relevant nonfunctional requirements. Use one or more obligations per requirement; several checks can support the same promise.

“Reject malformed input” needs more than an error response. If rejection must leave stored data unchanged, the plan needs an observation of that state. If retries may overlap, sequential replay does not settle the concurrent behavior. Keep unresolved product choices visible before generating tests.

### 3. Choose methods and levels suited to the claim

A requirement review can expose an ambiguous acceptance rule. Static analysis can investigate particular defect classes. A unit test can isolate a function, while an integration test observes the actual boundary between components. Fault injection examines a selected failure path. Formal analysis can establish a stated property under its modeled assumptions. Choose the combination that answers the question.

NIST’s developer-verification guidance describes a range of techniques, including threat modeling, automated and structural testing, static analysis and fuzzing. It is a useful source for method breadth, not a claim that one checklist exhausts verification.[\[10\]](https://reqproof.com/topics/software-verification-plan#s10) Record why an omitted method is unnecessary for the scoped claim or where another plan covers it.

### 4. Write an acceptance criterion before implementing the check

State the inputs and preconditions, the observable result and the conditions for judging it. Derive the expected result from the approved requirement. “Returns an error” and “returns an error with no committed rows or completion record” are different criteria. Record units, tolerances, ordering, time bounds and state where they matter.

For a review, define the subject and review questions, the required reviewer role and the record that demonstrates completion. For a performance test, define the workload, target environment and measurement rule. A universal “95% tests pass” rule cannot decide whether an untested high-consequence obligation is acceptable.

### 5. Name people, environments and dependencies

Assign an executor and the person or policy authorized to assess the evidence. Record any required independence. Identify the candidate build, tool versions, configuration, data set, credentials or access arrangements, external dependencies and environment readiness checks. Describe important differences between a simulator and the operating environment.

Ownership should be actionable: a named team role with an assigned person or queue, not “QA will handle it.” A missing environment is a blocker to resolve; it is not a passing result. NASA’s product-verification guidance likewise treats preparation, execution, analysis and retained records as distinct work.[\[4\]](https://reqproof.com/topics/software-verification-plan#s4)

### 6. Link the work to milestones and readiness gates

Plan the earliest useful review or execution and the inputs it depends on. Requirements and prototype validation can begin before production code exists. Interface checks may depend on a supplier build. An operational recovery exercise may need a representative deployment and an available operator.

Use concrete entry and exit conditions: the candidate is identifiable, the environment is ready, the oracle is reviewed, and required results are available for a decision. Reserve effort for investigation and reruns. A calendar date does not make an incomplete environment ready.

### 7. Define result handling and evidence retention

Specify where the raw observations, summary, anomalies and review decisions will be stored. Preserve the requirement and code basis, test/procedure identity, relevant configuration, timestamps, tool versions and expected/actual results. Keep failures and partial runs visible. The report should explain what was performed and what remains unresolved, including an execution that never reached its assertion.

An exception needs its own authorized disposition, scope and revisit trigger. Do not convert it into a fictitious test pass. The [software verification report guide](https://reqproof.com/topics/software-verification-report) covers the result artifact that follows this plan.

### 8. Review the plan and control changes to it

Have the relevant engineering, product and assurance owners challenge the scope, criteria and evidence choices. Resolve disagreements or retain them as assigned decisions. Baseline the agreed plan, then assess the effect of changes to requirements, code, dependencies, environments and verification procedures.

A planned review should not disappear merely because its evidence is inconvenient to produce. Changing the obligation is a change to the acceptance basis. Current NASA software requirements explicitly address updating test and verification plans when requirements change; the same discipline is useful for an ordinary software team.[\[6\]](https://reqproof.com/topics/software-verification-plan#s6)

05 / Plan development and evidence together

## Software development and verification planning: choose a strategy

The development plan explains how the software will be built. The verification strategy explains why the chosen checks should establish the required claims. Coordinate them early enough that architecture, observability, environments and delivery dependencies support the evidence you will need. A strategy that requires an unavailable production-like environment has a scheduling problem as well as a testing problem.[\[2\]](https://reqproof.com/topics/software-verification-plan#s2)[\[7\]](https://reqproof.com/topics/software-verification-plan#s7)

A verification strategy connected to development milestones

| Development work | Verification or validation activity | Exit evidence |
| --- | --- | --- |
| Understand the change | Review the requirement, intended use, hazards and open decisions with the relevant owners. | Agreed behavior, scoped risks and assigned unresolved questions. |
| Choose the design | Review interfaces, failure paths and feasibility of the planned checks; examine prototypes with users where useful. | Review findings, selected methods and an achievable environment plan. |
| Implement a component | Run the required reviews, analyses and focused executable checks. | Results tied to the component and requirement revisions. |
| Integrate the system | Exercise real interfaces, deployment configuration, failure recovery and relevant nonfunctional behavior. | Observed integrated behavior, discrepancies and remaining constraints. |
| Assess release readiness | Review current evidence, validation findings, exceptions and operational prerequisites. | Recorded acceptance or rejection by the designated authority. |
| Maintain the product | Review change impact, renew affected evidence and retain lessons from defects. | Updated plan, regression results and traceable decisions. |

### Choose rigor by the consequence and uncertainty

Prioritize failures with consequential outcomes, hard-to-observe behavior, uncertain dependencies or costly recovery. The import’s atomicity obligation deserves a persisted-state check because a clean error message can hide corruption. Its concurrency obligation needs overlapping execution because a sequential replay cannot challenge the race. This is a reasoned choice of evidence, not a score manufactured from a count of tests.

A small web feature may need a compact plan and existing CI. A migration may need behavioral comparisons and durable-effect checks. An embedded release may need target-specific evidence and a governed assurance process. Choose methods after naming the claim; use metrics to describe the work that was actually done.

### Make the plan work in an iterative team

Keep a project-level agreement for environments, roles, evidence retention and acceptance policy. Add change-specific obligations to the issue or pull request, linked to that agreement. Review them when the intended behavior changes, not only at the end of a sprint. A plan can evolve with development while retaining the history of what was agreed and why.

For agent-assisted development, give the agent the relevant requirements, expected observations and evidence obligations before implementation. Keep authority over changes to the acceptance basis explicit. An agent can help draft a plan, create checks and collect results; the plan must still identify who may decide that those results are sufficient.

06 / Include the intended use

## Software verification and validation plan: what changes?

A combined software verification and validation plan covers two questions. Verification examines conformance to specified requirements. Validation examines whether the product and its requirements meet the needs of its users in the intended context. Both can occur throughout development; validation is not limited to a final acceptance test.[\[1\]](https://reqproof.com/topics/software-verification-plan#s1)

> “Are we building the product right?”
> “Are we building the right product?”
>
>
>
> NASA’s IV&V overview uses these questions to distinguish verification and validation.[\[1\]](https://reqproof.com/topics/software-verification-plan#s1)

Two claims about the same import workflow

| Planning question | Verification | Validation |
| --- | --- | --- |
| Claim | A malformed batch commits no rows and no completion record. | The rejection and recovery workflow lets the intended operator complete a legitimate import without losing or duplicating data. |
| Evidence to plan | Run selected malformed batches; compare response and persisted state with explicit expected results. | Review intended use and exercise representative recovery scenarios with the appropriate users or stakeholders. |
| Acceptance basis | The specified error and database state for every required case. | Agreed operational outcomes and success criteria in the intended environment. |
| Status in this guide | Selected local cases executed; concurrency and a documentation review remain open. | Operator exercise planned, not performed. |

To extend the template into an SVVP, add the intended users, operational scenarios, environment, stakeholder involvement, validation methods, success criteria and decision owner. Keep verification and validation results distinguishable even when a test supports both. A correctly implemented rule can still be the wrong product rule.

NASA’s public NOS3 V&V plan is a useful example of how a real project organizes these activities and responsibilities. Its public verification and validation matrix appendices are marked TODO, so use it as a structure reference, not as a completed evidence package.[\[11\]](https://reqproof.com/topics/software-verification-plan#s11)

### Does the work need to be independent?

Set the required separation of roles from your project’s risk and governing process. A second engineer reviewing a test can improve scrutiny, but it does not automatically establish full independent verification and validation. NASA’s description of IV&V includes technical, managerial and financial independence.[\[1\]](https://reqproof.com/topics/software-verification-plan#s1) Record the actual arrangement instead of relying on the initials.

07 / Decide what ready and complete mean

## Verification plan checklist: before execution and before acceptance

Separate readiness to run a check from completion of its evidence obligation. Then separate both from the decision to accept a change. This keeps a prepared test environment, a successful test command and a release approval from becoming interchangeable labels.

### Before execution

- The requirement and candidate baseline are identifiable.
- The method, inputs and expected observations are reviewed.
- The environment, data, tools and access are ready.
- An executor, reviewer and evidence location are assigned.
- Dependencies, blockers and stop conditions are visible.
- The plan says what happens when the check cannot complete.

### Before acceptance

- The required results refer to the intended baseline.
- Assertions address the agreed behavior and relevant state.
- Missing, partial, failed, stale and blocked work is disclosed.
- Required reviews and validation activities have records.
- Exceptions have an authorized, scoped disposition.
- The designated authority records the acceptance decision.

### Use statuses that describe evidence

A practical status vocabulary for a verification register

| Status | Meaning | Next action |
| --- | --- | --- |
| Planned / missing | The obligation exists; the required observation has not been recorded. | Prepare and perform the check, or resolve its blocker. |
| Partial | Only some of the required supporting evidence is available. | Identify exactly which part is still needed. |
| Failed | An observed result violates the declared criterion. | Investigate, correct the issue and rerun affected evidence. |
| Blocked | A named dependency prevents credible execution or review. | Assign the dependency and a resolution path. |
| Stale | The evidence basis has changed and reuse has not been justified. | Assess impact; rerun or document an authorized reuse decision. |
| Supported | The required current evidence meets the rule used to assess this obligation. | Complete any separate review or acceptance decision. |
| Exception approved | An authorized disposition permits a stated deviation. | Retain its rationale, limits, owner and revisit trigger. |

The example’s checker uses a small declared subset of this vocabulary. Its “supported” count is a summary of the six specified verification obligations, not a universal completeness score. Four of six after the fix leaves two real tasks; averaging that into a reassuring percentage does not resolve them.

08 / Avoid evidence you have to reconstruct

## Verification planning mistakes and what they cost

Six mistakes to catch before the plan becomes an acceptance basis

| Mistake | Consequence | Correction |
| --- | --- | --- |
| List test names without expected observations | A passing test may check a convenient proxy for the requirement. | Record the oracle, relevant state and failure condition. |
| Let the implementation decide the requirement | The code and its generated tests can agree on the same wrong behavior. | Resolve and approve the product decision before deriving assertions. |
| Treat unit results as system evidence | Storage, interfaces, concurrency or deployed configuration remain unexamined. | Assign those claims to explicit integration and operational checks. |
| Forget reviews, data or people in the schedule | A nominally finished feature cannot produce the required evidence. | Name readiness dependencies and reserve review/rework capacity. |
| Reuse an old result without checking its basis | The acceptance record describes a different requirement or candidate. | Retain revisions and assess what changed before reusing evidence. |
| Remove an inconvenient obligation to make the plan green | The acceptance basis changes without a visible decision. | Require the authorized owner to approve and explain the plan change. |

A useful review question is: **What could still be wrong if every currently listed test passes?** In the import example, that question points to persisted state, concurrent retries and operational recovery. It is a practical way to challenge the plan’s scope without pretending that a fixed checklist can discover every missing requirement.

09 / Keep the plan attached to the project

## From a verification plan to connected evidence with Proof

Proof’s Software Intent Graph connects requirements, dependencies, code, hazards, Changes and evidence. That context gives people and coding agents a place to understand what a change must preserve and why a planned check exists. The plan, its observed results and the authority to accept the change remain separate parts of the record.[\[13\]](https://reqproof.com/topics/software-verification-plan#s13)

Start with a rule. Inspect the project context.

### A free micro-tool, and the wider workflow.

Use the quick workflow in [Proof’s free Spec Lab](https://reqproof.com/spec-lab) to work through an individual written rule, review its interpreted formula and generate a test plan you can take into your workflow. Review the interpretation before relying on the proposed cases. Spec Lab plans cases for the rule; it does not execute your application or measure its coverage.[\[14\]](https://reqproof.com/topics/software-verification-plan#s14)

Use the portal to inspect project records and MCP to bring requirements, dependencies and recorded evidence into your coding agent’s context. Run application checks in your repository or CI, and retain the results against the relevant requirement and revision. Review the current [Agents and MCP description](https://reqproof.com/agents) for the supported workflow; this guide’s local teaching example is separate from those product capabilities.[\[13\]](https://reqproof.com/topics/software-verification-plan#s13)

[Try free Spec Lab ↗](https://reqproof.com/spec-lab)[Explore Proof portal ↗](https://portal.reqproof.com/)[Explore the MCP workflow ↗](https://reqproof.com/agents)

### Keep four states visible as the work changes

1. **Planned.** The requirement names the evidence to obtain, its acceptance rule and responsible role.
2. **Executed.** A run or review records observations against an identifiable basis.
3. **Current.** The relevant requirement, code, configuration and environment still match, or reuse has been assessed.
4. **Accepted.** The project’s designated authority records whether the evidence is sufficient for the decision.

A graph helps locate the obligations affected by a change. The quality of the links and the scope of the analysis still matter. Replacing SQLite with a remote service, for example, changes the import’s transaction and failure assumptions even if the unit-test inputs stay the same. Review the affected plan rows and renew the relevant evidence.

### What belongs in a CI gate?

A gate can enforce that required checks exist, ran against the intended candidate, produced usable results and satisfy the configured policy. It should distinguish a failed check from a missing report or stale input. The example kit includes a small manifest checker to make this distinction concrete; it is teaching code, not a Proof CLI integration.

Enforcement also depends on repository and release settings. A report-producing job does not stop a merge unless the workflow makes its result required. Preserve the power to change requirements, plan obligations and exception policy explicitly; giving an agent a test command does not settle those permissions.

10 / Choose what fits the work

## Which verification planning workflow should you use?

Choose by who must author, execute, review and maintain the plan. Start with one representative change and check whether someone else can follow the record from requirement to observed result.

Planning approaches and the work each leaves with your team

| Approach | Useful when | What to account for |
| --- | --- | --- |
| Document and spreadsheet | A bounded change, familiar review process or required document deliverable. | Manual synchronization, version control and links from rows to actual results. |
| Repository records and CI | Engineers need plan changes reviewed beside source and automated checks. | Schema ownership, meaningful assertions, evidence retention and enforced pipeline policy. |
| Requirements or lifecycle platform | Multiple teams need controlled requirements, approvals and reporting. | Execution integrations, trace quality, freshness and the difference between workflow status and evidence. |
| Proof project workflow | People and agents need connected intent, code, risks, planned checks and evidence. | Repository scope, current capabilities, required methods and the project’s acceptance authority. |

### How these options were selected

This guide is published by Proof and includes its own workflow. The comparison groups practical ways to maintain the plan; it is not a scored product benchmark. We assessed who owns each record, how results remain connected, how changes are handled and how a reviewer reaches a decision. We did not measure vendor performance, collect quotations or evaluate qualification packages.

The Word and Markdown templates are free downloads. Other costs depend on licenses, integration, evidence storage, environment setup and the time required to maintain a trustworthy record. Test a representative workflow before expanding it across the organization.

I need a plan

### Start with the template.

Tailor the scope and roles, then add the obligations that support your actual decision.

[Get the editable plan ↑](https://reqproof.com/topics/software-verification-plan#template)

I have a written rule

### Make its cases clear.

Use the free Spec Lab micro-tool to inspect a requirement and take its test plan into your process.

[Open free Spec Lab ↗](https://reqproof.com/spec-lab)

I have a project

### Connect the whole workflow.

Inspect Proof’s connected project context and discuss the evidence workflow your plan needs.

[Bring a plan to Proof ↗](https://reqproof.com/demo)

### For QA and verification leads

Use the register to review the evidence obligation before reviewing the test implementation. Ask whether the oracle addresses the promise, whether the environment is credible and whether omitted work has an owner. Make the status of a missing check as visible as a failed one.

### For developers and teams using coding agents

Start with a bounded change and its affected requirements. Give the agent a clear expected result and the relevant project context. Preserve failed observations and the reasoning behind repairs so the next task can reuse more than the code diff.

### For product owners and delivery managers

Resolve choices such as partial import, retry behavior and recovery expectations before the team encodes them. Use the plan to expose people, environment and review dependencies. Review whether validation activities cover the user workflow you actually intend to release.

### For regulated or safety-related teams

Establish the applicable standard, contract, assurance level and approved lifecycle process first. Add the required independence, target evidence, reviews, coverage and tool controls. This template is engineering guidance and does not establish compliance or certification. Proof’s MC/DC tooling is not certified.

### Who this guide is not for

This is a software planning guide, not a semiconductor verification methodology or a complete safety case. If you need a regulated deliverable, use the governing sources and responsible assurance process. If you need a report of completed work, start with the [verification report guide](https://reqproof.com/topics/software-verification-report). If the behavior itself is unresolved, establish the requirement before optimizing its check list.

## Standards and reference plans: use the right basis

First distinguish a source that governs your project from guidance you are using to improve it. Record the edition, scope, applicable obligations and responsible interpretation. A plan that cites a standard without mapping its requirements has not established conformance.

Primary references and their limits

| Reference | Useful for | Boundary |
| --- | --- | --- |
| IEEE 1012-2024 | Lifecycle verification and validation of systems, software and hardware. | The current IEEE catalogue identifies this edition. Consult the licensed standard for normative requirements; this template is not claimed compliant.[\[8\]](https://reqproof.com/topics/software-verification-plan#s8) |
| ISO/IEC/IEEE 29119-3:2021 | Software test documentation. | The public abstract identifies documentation templates across lifecycle models. It does not turn every testing document into a complete V&V plan.[\[9\]](https://reqproof.com/topics/software-verification-plan#s9) |
| NASA NPR 7150.2D | Examples of lifecycle planning, traceability, testing and controlled updates. | NASA applicability and tailoring provisions matter. Its requirements are not automatically obligations on every commercial project.[\[5\]](https://reqproof.com/topics/software-verification-plan#s5)[\[6\]](https://reqproof.com/topics/software-verification-plan#s6) |
| NASA GCS verification plan, 1990 | An inspectable historical software-plan document. | It belongs to its original GCS and DO-178A context. Use it as an example, not a current universal certification template.[\[12\]](https://reqproof.com/topics/software-verification-plan#s12) |

For an airborne, medical, automotive or other governed project, reconcile this structure with the actual applicable sources and the people responsible for their interpretation. A generic guide cannot decide the required assurance level, independence or qualification obligations for an unspecified product.

11 / Evidence behind the guide

## Primary sources and reproducible artifacts

The planning guidance draws on primary NASA, NIST, standards-catalogue and government sources. The import implementation, plan, checker and observed results are original teaching artifacts in the download. They have a different role from the external references and from Proof’s product capabilities.

A useful project reference

### NASA NOS3’s verification and validation plan

Inspect how a real project connects purpose, scope, responsibility, development activities, methods, environments and V&V. Its unfinished matrix appendices are a useful reminder that an outline and a completed evidence record are different artifacts.

[Read the public plan ↗](https://nos3.readthedocs.io/en/latest/STF_VV_Plan.html)

1. [NASA — Independent Verification & Validation overview](https://www.nasa.gov/ivv-overview/) Verification, validation throughout the lifecycle, and the technical, managerial and financial dimensions of independence.
2. [NASA Software Engineering Handbook — 5.08, Software Development / Management Plan](https://swehb.nasa.gov/spaces/SWEHBVD/pages/102695668/5.08+-+SDP-SMP+-+Software+Development+-+Management+Plan) Coordinating lifecycle methods, verification and validation, resources, environments, records and schedule.
3. [NASA Software Engineering Handbook — 5.10, Software Test Plan](https://swehb.nasa.gov/spaces/SWEHBVD/pages/102695671/5.10+-+STP+-+Software+Test+Plan) Testing scope, levels, types, environments, progression, resources and acceptance criteria. Its example metrics are not universal targets.
4. [NASA Systems Engineering Handbook — Product realization, section 5.3](https://www.nasa.gov/reference/5-0-product-realization/) Preparing, performing, analyzing and recording product verification. This broader systems guidance is adapted here to software planning.
5. [NASA NPR 7150.2D — Chapter 3, Software management requirements](https://nodis3.gsfc.nasa.gov/displayDir.cfm?Internal_ID=N_PR_7150_002D_&page_name=Chapter3)NASA lifecycle plans, planning activities and bidirectional traceability. Apply NASA's applicability and tailoring provisions where relevant.
6. [NASA NPR 7150.2D — Chapter 4, Software engineering lifecycle requirements](https://nodis3.gsfc.nasa.gov/displayDir.cfm?Internal_ID=N_PR_7150_002D_&page_name=Chapter4) Sections 4.5.2, 4.5.7 and 4.5.11 address test records, keeping test and verification plans consistent with requirements, and regression testing.
7. [UK Government Teal Book — Chapter 34, Verification and validation](https://projectdelivery.gov.uk/teal-book/home/part-f-solution-delivery/chapter-34-verification-and-validation/) Early planning, stakeholder needs, methods, preparation and results in the delivery lifecycle; cross-domain guidance, not a software certification standard.
8. [IEEE — IEEE 1012-2024 catalogue record](https://standards.ieee.org/ieee/1012/7324/) Public scope and edition information for lifecycle systems, software and hardware V&V. The licensed clauses were not reproduced or audited against this template.
9. [ISO — ISO/IEC/IEEE 29119-3:2021 catalogue record](https://www.iso.org/standard/79429.html) Public abstract for software test documentation templates across lifecycle models. Full normative text is separately licensed.
10. [NIST IR 8397 — Guidelines on Minimum Standards for Developer Verification of Software](https://doi.org/10.6028/NIST.IR.8397) Paul E. Black, Barbara Guttman and Vadim Okun. A primary source for the range of developer-verification techniques, including analysis and multiple forms of testing.
11. [NASA NOS3 — STF Verification and Validation Plan](https://nos3.readthedocs.io/en/latest/STF_VV_Plan.html) Public project example. Its verification and validation matrix appendices are marked TODO in the version checked; no completed matrix is implied.
12. [NASA — Guidance and Control Software Project, Software Verification Plan (1990)](https://ntrs.nasa.gov/api/citations/19900008741/downloads/19900008741.pdf) Historical GCS plan, in its original DO-178A context. It is not a current universal compliance template.
13. [Proof — Agents and MCP workflow](https://reqproof.com/agents) First-party description of how agents use connected project intent and evidence. Product capabilities have a different basis from the local teaching fixture.
14. [Proof — Free Spec Lab](https://reqproof.com/spec-lab) The free micro-tool works through an individual written rule, its interpreted formula and a reviewable test plan.
15. [Original import plan, code and recorded evidence](https://reqproof.com/assets/software-verification-plan/downloads/software-verification-plan-kit.zip) Source, declared expected results, three actual runs, status checker, environment and file hashes. The README states the executed scope and remaining work.

Sources checked 27 October 2026. Public catalogue summaries do not substitute for licensed normative text. No source is presented as an endorsement of Proof or this template.

Two more examples / make the criterion observable

## Two planning examples beyond the importer

### 1. A latency requirement needs a workload

Suppose an agreed requirement says the 95th-percentile response time must be at most 300 milliseconds at 200 concurrent users. The plan also needs the request mix, data size, deployment, warm-up, measurement window and treatment of errors. An idle-development-machine observation cannot establish that claim. These are illustrative requirement values, not a benchmark of Proof or any service.

### 2. A retry change needs a failure observation

Suppose a worker retries a timed-out request at most three times and the operation must have one durable effect. The plan needs to examine a timeout after the effect occurred but before the response arrived. Three retry counters in a log do not establish that only one record was created. Check the durable effect and the assumptions behind the idempotency mechanism.

The useful next step is one concrete promise and the evidence that would challenge it. If your team spends time reconstructing that relationship, [bring the plan and the change to Proof](https://reqproof.com/demo).

12 / Common questions

## Software verification plan questions, answered

What is a software verification plan?

It defines how identified software work products will be checked against specified requirements. It records scope, methods, expected observations, environments, people, evidence and acceptance rules. It also explains how incomplete work and relevant changes are handled.

What should a verification plan include?

Include the scope and baseline, applicable requirements and risks, selected methods, acceptance criteria, responsible roles, environments, schedule, evidence records and change controls. The [12-section template](https://reqproof.com/topics/software-verification-plan#template) provides an editable starting point. Tailor it to the decision and governing process.

How is a verification plan different from a test plan?

A test plan organizes the testing effort. A verification plan can also include reviews, inspections and analysis of requirements, designs, code and other work products. Organizations may combine the documents; keep each claim, method and responsibility clear.

What is a software verification and validation plan?

A combined V&V plan organizes evidence for conformance to specified requirements and suitability for intended use. Add users, operating scenarios, validation criteria, stakeholder involvement and decision owners. Verification and validation can both occur throughout development.

How do software development and verification planning fit together?

Coordinate methods, environments, resources and review gates with development milestones. Plan evidence early enough to influence design and observability, then update affected obligations as the software changes. The verification strategy can be part of the development plan or a linked controlled record.

Who writes and approves the verification plan?

The project assigns authorship and approval according to its responsibilities and assurance needs. Developers and verification specialists can draft the technical work; product, operations and assurance owners contribute where their decisions matter. Record who can approve requirements, assess evidence and accept the change rather than assuming those are the same role.

Do passing tests mean the verification plan is complete?

No. Passing tests establish their assertions for the executed cases and recorded basis. The plan may still require additional cases, integration checks, reviews or validation. In the [worked example](https://reqproof.com/topics/software-verification-plan#example), all five repaired cases pass while two verification obligations and a separate validation activity remain unperformed.

Can AI or Proof help create and maintain the plan?

AI can help draft obligations and checks, but the expected behavior and acceptance authority need to remain explicit. Use [Proof’s free Spec Lab](https://reqproof.com/spec-lab) for an individual rule; the [Agents and MCP workflow](https://reqproof.com/agents) provides connected project context for coding agents. Generated plans and test cases still need review and execution.

## What changed in this guide

27 Oct 2026

**Expanded planning guide.** Expanded the existing import-planning illustration with an explicit whole-batch rejection rule, editable templates, a filled register, recorded SQLite runs, an interactive evidence view, a walkthrough, development-strategy and V&V guidance, and Proof workflows.

## Continue from plan to evidence

[Report **Record what actually ran**

Keep revisions, results, gaps and acceptance visible.](https://reqproof.com/topics/software-verification-report)[Traceability **Connect the requirement to its checks**

Use a matrix with explicit evidence and status.](https://reqproof.com/topics/requirements-traceability-matrix)[Test design **Derive assertions from the promise**

Turn intended behavior into meaningful checks.](https://reqproof.com/topics/requirements-based-testing)[Requirements **Write the behavior you mean**

Define scope, interfaces and acceptance criteria.](https://reqproof.com/topics/software-requirements-specification)

Proof / Start with a consequential change

## Bring the plan. Make the evidence *inspectable.*

Connect the intended behavior to the work that supports accepting it. Start with one change in your existing project.

[Bring a plan to Proof](https://reqproof.com/demo)